patching...
Welcome back, Patch Blogger!
Local Voices
City of Saline Parks & Recreation Director

Library-Brecon Pathway is Under Construction

The Library-Brecon Pathway project started mid-October. The path is located along the south side of Brecon Park and north of the inactive railroad right of way. An earth grade has been established so that a 6” limestone base and then 10’ wide 2’ deep bituminous pavement can be placed on it.  This non-motorized pathway will link Maple Road to Harris Street.  

Leave a comment